Brentwood WWTF Upgrades

Modifications to Citrus County’s Brentwood WWTF entailing:

  • Modification of the existing 2-stage oxidation ditch to a 4-Stage oxidation ditch
  • Modification of the existing mechanical equipment within the oxidation ditch to include new surface mechanical aerator; new platform-mounted anoxic basin mixer; electric-motor actuator installed on the existing oxidation ditch diverter gate; DO, ORP, & NO3 probes and Nitrogen-reduction process control system
  • RAS pump station - New RAS pumps and controls

Project Information

Brentwood WWTF
Lecanto, FL
Start Date:
2-2025
End Date:
3-2026